Although the bathroom is not large, but powerful, decoration up things really a lot, water and electricity, waterproof, tile shop, ceiling, bathroom facilities, etc. to worry about everything. Following is a small series with a look at the bathroom renovation five gold process.
Five gold processes
1, water and electricity transformation of the bathroom renovation is the first step in the bathroom renovation, in the cover before the need to have a detailed water and electricity to design, to meet the needs of the use, to facilitate our lives. It is best to be able to do after the maintenance and maintenance are more convenient. Of course, the design also pay attention to beautiful. Finally, the treatment of concealed works.
2, waterproof measures not only has the function of household toilet toilet, wash bath, often have the function. Can be said that the bathroom is a very humid environment, so in the decoration of the bathroom when the waterproof work must be done in place. Toilet waterproof paint is extended to the surface by the ground, and the process of coating to ensure that the thickness of the uniform. Also need to deal with the surface and wall at the junction of the various types of pipe.
3, ceramic tile shop pastes the toilet to spread the ceramic tile not only has the decoration function but also can strengthen the wall surface and the ground waterproof effect. So on the tiles with the bathroom suggested that we choose the surface with a concave and convex lines and waterproof tiles such as ceramic tile is very suitable for the bathroom.
4, the ceiling design bathroom as a shower place, often produce a lot of steam, so the bathroom ceiling material must also have waterproof, moisture, anti-corrosion, high temperature resistance function. The bathroom ceiling material is the common aluminum buckle.
5, bathroom facilities in the bathroom bathroom toilet, bathtub, generally have a shower, washbasin, storage etc.. In the installation of sanitary facilities, it is recommended that we do a general area of separation design, the use of water cut off the two regions to make the two space does not interfere with each other.
Attention to the bathroom renovation
Bathroom renovation process is understood, we know about the bathroom renovation notes.
1, waterproof work must be done in the bathroom.
2, acceptance of the toilet water works must be done 24 hours of closed water experiment, do not be careless.
3, the choice of the best material for the bathroom waterproof, moisture, corrosion protection materials.
4, the bathroom switch and socket is best set in the bathroom outside.
5, the bathroom layout should be reasonable.