1st. must do a good job at the top of the moisture measure. Water is the core, because the toilet water is very large. The toilet and bathroom buildings generally are connected together, so that water is not the exception, not defense, will be a big risk, so the top of the moisture to do? The best in the bathroom ceiling on waterproof, coated with a layer of water glass, some have waterproof function strong buckle the keel and pipe cover. Of course, you can also do the ceiling.
2nd. general new buildings in the bathroom, will carry out some waterproof measures, then, these primary measures, you have to protect, for the original waterproof layer do not damage the. General will floor brick, re distributing pipe, so in this process, to be careful, if, when you re layout must re do the waterproofing, and will make joint, especially the floor drain don't forget.
3rd. if the waterproof project finished, be sure to check some places, such as sealed interface and drain well, water must be installed in the bathroom, after twenty-four hours, to see if there is no change, if found, change of penetration of the phenomenon will be done so, some decoration workers have no professional knowledge and just use glass glue on it, this is not enough, must ensure that no water seepage, the floor tile.
4th. except for the bathroom waterproof, but also pay attention to non slip, so the bathroom materials, the best selection of non slippery material, but the layout process circuit should also pay attention to choose some waterproof materials, lights too, or if due to moisture lead to short-term, is a huge impact.